The façade renovations at Air Rights West included the removal of almost 1,000 windows, and cutting of the precast for the installation of 500 new larger windows, and recoating of the exterior precast panels with a Granyte finish. Replacement of all the windows and recoating of the precast was also performed on the East Tower. All work was performed off hours in occupied spaces.
Location: Bethesda, MD
Owner: MRP Realty
Architect: Morgan Gick McBeath & Associates
Structural Engineer: Haynes Whaley and Associates
Engineer: META Engineers, P.C.
Square Footage: 57,750
Repositioning, Tenant Interiors, Pre-construction, General Contractor