East Severn Way is a speculative built 68,726 SF flex industrial facility. The building construction is concrete tilt up with cast in place concrete retaining wall/walk way at the front elevation. An underground primary electric cable was discovered at the onset of construction creating many challenges for efficient completion of the building foundations and site work.

Location: Sterling, VA

Owner: The Maven Group

Architect: W.A. Brown & Associates, P.C.

Civil Engineer: Rinker Design Associates, P.C.

Structural Engineer: Cardno Haynes Whaley

Engineer: Aspire Engineering

Square Footage: 68,762

Flex/Industrial, General Contractor